KiwiRail: Historical Maintenance

Stations Tracks Structures Tunnels

Description

A large investment has gone into overdue upgrades, which includes replacing worn-out track and structures, redoing drainage systems and stabilising slopes.

On the Wairarapa Line, the team is replacing all tracks (including inside tunnels and over bridges) in addition to drainage and vegetation work. The Kāpiti Line will see stabilisation work. Along the Johnsonville Line, tracks are being replaced inside 7 tunnels. At the Wellington Railway Station, the team is renewing tracks and track connections.

Updates

Benefits

A safer and more resilient network that can support future passenger growth.