NZTA have scheduled roadworks that will close the Petone SH2 on-ramp to all...
There’s still more work to be done upgrading the Wellington rail network....
The weekday 7.04am service from Upper Hutt to Wellington is cancelled from ...
Due to extensive mechanical issues with the English Electric trains and cus...
Valid from: 07/02/2012 9:00pm to: 10/02/2012 5:00am
NZTA have scheduled roadworks that will close the Petone SH2 on-ramp to all traffic over three nights – from Tuesday 7 February to Thursday 9 February 2012. This will affect Route 83 and Route 91 southbound services only. Please see below or read the map for further diversion information.
When: 9.00pm to 5.00am from Tuesday 7 February to Thursday 9 February 2012.
Affected routes: 83 and 91
Route 83: Southbound
From Jackson Street, turning right into Hutt Road and travel north to the Dowse Interchange. Turn right from Hutt Road into the Interchange and take the southbound off-ramp onto State Highway 2. Continue south until usual route resumes.
Route 91: Southbound
Usual route from Cuba Street into Jackson Street, however, instead of turning left into Fitzherbert Street, continue along Jackson Street to the Jackson Street roundabout, turn right into Hutt Road and travel north to the Dowse Interchange. Turn right from Hutt Road into the Interchange and take the southbound off-ramp onto State Highway 2. Continue south until usual route resumes.
Closed Bus Stops: Stop #8001 – Te Puni Mail Centre
Passengers will be directed to Jackson Street - Kathmandu (Stop #8002).
This map shows details of the diversion.